xv Chapter V: Proposal for improvement The technical proposals are developed based on the results obtained in chapter IV. A change in working method and the acquisition of new equipment were proposed. In this way, the standard time was recalculated with the improvement proposals, in which the time was reduced. In addition, the production planning, the inventory calculation and the material requirement plan were carried out. Finally, a schedule for the implementation of the improvement proposals was made. Chapter VI: Costs The estimated investment cost for all improvement proposals is presented, which is Bs 196,305.00. In addition, they have the conclusions and the recommendations of this work, as well as the bibliography used and the respective annexes.